Reassuring Energy

 Solar Power Systems

Various activities are carried out in the world of power generation and solar energy in Turkey. Aksaray Enerji and experienced engineers ; supply, installation, commissioning, maintenance, and maintains continuity with mobile monitoring activities.

 Fault Maintenance

The company has become one of the hallmarks of the Central Anatolian fault maintenance work . We are one of the best and experienced team in the breakdown maintenance of electricity distribution companies.

 Contracts and Projects

Our company is committed to services offered by the project for electrical installations and the purchase network technologyand application / includes all of the installation phase.

 News

Aksaray Enerji in Solarex Fair..

Between 7-9 April 2016 , held at the Istanbul Expo Center Solarex We attended the 9th International Solar Energy & […]

Gebze, Kocaeli with our suppliers who have made our ongoing TSE Solar Power Plant Project trips.

Gebze, Kocaeli ongoing ” TSA Solar Power Plant Project” , a total of 250 W solar panel project in 4008 […]

 Faq

Sun used wherever it is enough . Whether in the field , or on the roof.

It is easy to use .

Is no need for complex technology.

It is suitable for local application.

Operating costs are very low.

It is a kind of clean energy .

It pays for itself in a short time .

Is inexhaustible energy source.

Application areas are spacious .

Solar energy gas, smoke , no harmful residues such as sulfur or radiation. Can be used in the region benefited from the energy needed to power transmission problems exist and are cheaper almost no costs.

On the Grid:

Grid-connected photovoltaic systems, battery storage of electricity produced in the
It is working based on the principle of exhaustion rather than the production site.

Projecting or while generating the desired amount of energy needed
It is determined. Contact with the sun’s rays onto solar modules from the atmosphere
DC electrical energy to the generated.

Produced with high energy conversion power inverters connected to the network center, which is connected to the central mains system. Thus, the energy produced from the panel would be sent directly to the network system.

Area and radiation conditions as appropriate in grid connected power generation system can provide the desired power electricity production.

Installation of solar power generation as well as an easy means of energy production, longevity, operating costs are very low, for reasons such as being practical and portable priority is preferable.

The advantages of grid-connected systems
– Easy to install,
– It has a high efficiency,
– Reliable,
– Flexible / have a modular scalable structure.
– Does not bring additional costs
– It makes the return on investment in a short period of time.

Note: Unlicensed electricity generation in accordance with the legislation of the electricity distribution network (direct = direct) directly connected to all facilities which include network (on-grid) are accepted. In addition to a consumer or a connection to its facilities by bus (indirect = indirect) production facilities which are linked to the mains, even if it is accepted grid-connected plants. So prescribed in the legislation should be designed according to the principles and procedures should be established and be able to run.

Off Grid:

Off Grid PV systems, electricity is the need where there is no network, which is quite remote, that the withdrawal of the mains power supply is too costly or not available in the network is used in places where there is often interrupted.

Use as often remote locations that need low energy houses and settlements

industrial applications stand out.

The main equipment used in these systems for solar panels, solar charge controller, batteries and inverters where necessary. Direct current produced by the solar modules (DC) electrical energy stored by the battery and charge controller to regulate. DC electrical workers

devices fed from the output load or battery charge controller to direct, alternating current (AC) powered device if the power is supplied via an inverter connected to the battery.

Off Grid PV system packages lighting, TV, satellite receiver and Turkey to meet the energy requirements of daily-used device such as a refrigerator to the west of the northern, central and southern

Write to the region and is designed taking into consideration the winter.

1. written petition addressed to the Distribution Company
2. Electricity Generation License application form
a.mülkiyet Certificate
b.araz their property or structure of the applicant together with the original copy of the title deed.
3. If the applicant is not the owner of the land or building and hire is made. Notarized lease
original or notarized copy of the agreement. The parties in the lease agreement if made in writing crops must have the signatures of the lease agreement.
4. signatures of the authorized signatories of the Company. A copy of the original on the condition that the presentation of original authorized signatures will be returned to the applicant.
5. single-line diagrams based on the application. Connection to the substation name, the name must necessarily obtain information, such as pillars and should be handled on a single line diagram.
6. For applications based on solar energy applications, except for the roof; absolute farmland, special product lands, planted farmland, irrigated fields, food for that environment land in coverage distorts the agricultural use integrity, Agriculture and Livestock Ministry or the concerned ministry to be received from provincial or district administrations document.
7. If the applicant is an old invoice for the subscription to be made or to be made building a new building, the new building permits in progress.
8. 1/25000 scale map. On this map of land, building, corner coordinates should be marked,
The list and map coordinates must be signed to be an engineer.
9 Technical compliance form.
10 based on the installed capacity of solar roofing applications and coordinated application sketch for applications other than under 11 kW solar applications.
11. plant will be established in PDF format 1 / 25000’lik map, stamped signature form of technical feasibility and technical suitability forms filled in excel format including the state of scanned CD or DVD format.
Appropriate Land Selection
Tilt, Road facade
Marginal Farmlands
TM Capacity
The Port,
From Substation
Park, Garden, Roof Applications (Residential, Apt., Factory, Public Institutions), Crop, Land, Gas Station, Closed Market Place roof, Road Lighting.
Administrative and Technical Assessment

* Determining the center and capacity transformer connectable

* Determination of the alternative investment area close to the substations

* In terms of investment realization by field analysis

* Making Technical Analysis

Technical Services

* Permits

* Analysis and Reports

* Other permits and project studies

* Mapping and planning

* Central area and transmission / operations will be based on the cost situation relating to the Distribution

* Project approval

* Licence energy limit was 1mW.

* Applications are performed by unlicensed energy distribution company.

* Link will be given permission is limited to 1mW line capacity in the region.

* 10 years, produced more electricity 0:13 ¢ / $ (dollar cents) gives the state guarantee uptake.

 Contact Us

Your comments and suggestions, Please share them with us

Name (required)

E-Mail (required)

Subject

Message

REFERENCES